Take off formwork quantities to the Vietnamese standard across seven element types, subtracting intersections with solid booleans so rotated elements at 30° or 45° still compute correctly.
Revit has no built-in notion of 'formwork area' — to take off coffa quantities, engineers have to derive it themselves from section perimeter times length in a schedule, total it by hand in Excel, and personally make sure every intersection with another member gets subtracted correctly.
Export a schedule of perimeters and heights, then multiply and sum it by hand in Excel for every column, beam, slab and wall type — and start over from scratch whenever the model changes before an issue.
The perimeter-times-height formula doesn't subtract the face hidden by another member — a beam framing into a column, a wall meeting a slab — so the total includes stretches that never need formwork, quietly inflating the number in a way that's hard to spot by eye.
The manual section-times-length formula only holds when a member runs straight along the grid; a column or beam set at an angle throws off the side-face area, and there's no quick way to cross-check and catch the error.
Costing needs its own summary broken out by floor and by element type — with nothing to compute it automatically, engineers filter the schedule, copy-paste, and cross-check it all over again for every quantity run.
See every family and type in the project: what is used, what is not, renamed and reloaded in batches.
Create, bind and remove shared parameters by category; find missing parameters before quantity take-off.
Fill parameters in bulk by formula, by location or by room — instead of typing element by element.